National Board Violation Findings
|
|
Reporting Year: 1999
|
|
Total Inspections: 22415
|
|
1. BOILER CONTROLS
|
|
1.1 Lo Water Cutoff and Flow Sensing Devices
|
25
|
|
1.2 Pressure Gages
|
4
|
|
1.3 Water Gage Glass
|
3
|
|
1.4 Pressure Controls
|
34
|
|
1.5 Temperature Controls
|
45
|
|
1.6 Undefined Controls Violations
|
22
|
| |
|
2. BOILER PIPING AND OTHER SYSTEMS
|
|
2.1 Main Steam System
|
1
|
|
2.2 Bottom Blow and Drain System
|
1
|
|
2.3 Feedwater, Condensate/Return Systems
|
2
|
|
2.4 Expansion Tanks and Heating System Piping
|
.
|
|
2.5 Casing, Stack Breaching and Flue
|
.
|
|
2.6 Burners and Fuel Supply Systems
|
75
|
|
2.7 Undefined Boiler Piping and Other Systems
|
.
|
| |
|
3. BOILER MANUFACTURER'S DATA REPORT & NAMEPLATE
|
|
3.1 No Data Report
|
.
|
|
3.2 Nameplate Stamping Incorrect/Missing
|
.
|
|
3.3 Undefined Manufacturer's Data Report & Nameplate
|
.
|
| |
|
4. BOILER COMPONENTS
|
|
4.1 Fireside Water Leaks
|
36
|
|
4.2 Baffles and/or Refractory
|
46
|
|
4.3 Furnace and Fireside
|
68
|
|
4.4 Waterside
|
12
|
|
4.5 Superheaters
|
.
|
|
4.6 Economizers
|
.
|
|
4.7 Installation
|
.
|
|
4.8 Undefined Boilers
|
.
|
| |
|
5. PRESSURE RELIEVING DEVICES FOR BOILERS
|
|
5.1 Installation
|
7
|
|
5.2 Operation
|
56
|
|
5.3 Undefined Pressure Relieving Devices
|
.
|
| |
|
6. PRESSURE VESSEL
|
|
6.1 Installation
|
8
|
|
6.2 Material Condition
|
36
|
|
6.3 Manufacturer's Data Report & Nameplate
|
.
|
|
6.4 Pressure Relieving Devices
|
57
|
|
6.5 Undefined Pressure Vessels
|
.
|
| |
|
7. REPAIRS AND ALTERATIONS
|
|
7.1 Unqualified Organization
|
.
|
|
7.2 Unauthorized Repair
|
.
|
|
7.3 Code Deficiencies
|
6
|
|
7.4 Undefined Repairs and Alterations
|
.
|